动感🔞小站可欣❌遼甯升降機的安裝技巧解讀_液壓升降機械有限公司

宁德天彩五金制造有限公司 用心(xin)·專注·專心(xin)用質量打(dǎ)造升降機(jī)械良心企(qǐ)業


全國咨(zi)詢熱線:

升(sheng)降機械
當(dang)前位置:首頁 » 遼(liáo)甯升降機(ji)的安裝技(jì)巧解讀

遼(liao)甯升降機(ji)的安裝技(jì)巧解讀

文(wen)章出處:www.lyhdw.cc 責(zé)任編輯:admin 人(rén)氣:1479 發表時(shi)間:2025-12-03 17:12:09

遼甯升(sheng)降機所使(shǐ)用的調節(jiē)閥在安裝(zhuang)時對環境(jìng)及其它要(yao)求各有不(bu)同,這兒我(wǒ)們就來講(jiǎng)講調節閥(fá)對遼甯升(shēng)降機工作(zuò)環境的要(yao)求及其安(an)裝技巧。Liaoning elevator control valve used in the installation of the environment and other requirements of different, here we come to talk about the work environment of the Liaoning elevator to the requirements and installation skills.

1.調(diao)節閥屬于(yú)現場儀表(biǎo),要求環境(jìng)溫度應在(zài)-25~60℃範圍,相對(dui)濕度≤95%。如果(guǒ)是安裝在(zài)露天或高(gao)溫場合,應(yīng)采取防水(shui)、降溫措施(shi)。在有震源(yuan)的地方要(yao)遠離振源(yuán)或增加防(fang)振措施。The regulating valve belongs to the field instruments, requirements of environmental temperature should be at - 25 to 60 DEG C, relative humidity is less than 95%. If it is installed in the open air or high temperature, should be taken to water, cooling measures. In a place away from the local oscillator source or increase the anti vibration measures.

 

2.調(diao)節閥一般(ban)應垂直安(ān)裝,特殊情(qing)況下可以(yǐ)傾斜,如傾(qīng)斜角度很(hěn)大或者閥(fa)本身自重(zhong)太大時對(duì)閥應增加(jia)支承件保(bao)護。Regulating valve generally should be installed vertically, special circumstances can be tilted, such as the tilt angle is large or the valve itself is too large when the valve should be added to support the protection of parts.

3.安裝調(diào)節閥的管(guan)道一般不(bú)要離地面(mian)或地闆太(tài)高,在管道(dào)高度大于(yú)2m時應盡量(liang)設置平台(tái),以利于操(cao)作手輪和(hé)便于進行(háng)維修。Installation of the pipeline is generally not from the ground or floor too high, in the pipeline height of more than 2m should be set as far as possible platform, in order to facilitate the operation of the hand wheel and easy maintenance.

4.安裝(zhuang)前應對管(guǎn)路進行清(qīng)洗,排除污(wu)物和焊渣(zhā)。安裝後,為(wéi)保證不使(shǐ)雜質殘留(liú)在閥體内(nèi),還應再次(ci)對遼甯升(sheng)降機進行(háng)清洗。Before installation, the pipeline should be cleaned to remove dirt and welding slag. After installation, in order to ensure that the impurities are not left in the body, but also to the Liaoning lift for cleaning.

5.在發(fā)生故障或(huo)維修的情(qing)況下使生(shēng)産過程能(néng)繼續進行(háng),調節閥應(yīng)加旁通管(guǎn)路。In the event of failure or maintenance of the case so that the production process can continue to be adjusted, the valve should be added to the bypass line.

6.拆修後(hòu)應注意加(jia)油潤滑,低(dī)速電機一(yi)般不要拆(chāi)洗加油。裝(zhuāng)配後還應(ying)檢查閥位(wei)與閥位開(kāi)度指示是(shi)否相符。Overhaul should be noted that after lubrication, low-speed motor is generally not washable. Assembly should also check the valve position and valve position indication is consistent.

此文關鍵(jian)字:遼甯升(shēng)降機

快訊(xun)新聞排行(hang)

升(shēng)降機知識(shí)排行

升(sheng)降機問答(da)排行

Sitemap
总 公 司急 速 版WAP 站H5 版无线端AI 智能3G 站4G 站5G 站6G 站